Viability of solar photovoltaics as an electricity generation source for Jordan

Pages 67-77 | Received 29 Sep 2008, Accepted 02 Dec 2008, Published online: 10 Feb 2009

Figures & data

Table 1. Daily mean values of sunshine duration, and annual values of global solar radiation on horizontal surface, measured at various sites in Jordan for the period 1994–2003.

Figure 1 Mean monthly variation of the recorded global solar radiation for Jordan, 1994–2003.

Figure 1 Mean monthly variation of the recorded global solar radiation for Jordan, 1994–2003.

Figure 2 Mean monthly variation of the recorded sunshine duration at each station, 1994–2003.

Figure 2 Mean monthly variation of the recorded sunshine duration at each station, 1994–2003.

Figure 3 Mean monthly variation of the recorded sunshine duration for Jordan, 1994–2003.

Figure 3 Mean monthly variation of the recorded sunshine duration for Jordan, 1994–2003.

Table 2. Mean monthly variation of the recorded global solar radiation at each station, 1994–2003.

Table 3. PV module specifications.

Figure 4 Annual electricity generated by the proposed 5 MW grid‐connected solar PV power plant for all the selected sites.

Figure 4 Annual electricity generated by the proposed 5 MW grid‐connected solar PV power plant for all the selected sites.

Figure 5 Specific yield of the proposed 5 MW grid‐connected solar PV power plant for all the selected sites.

Figure 5 Specific yield of the proposed 5 MW grid‐connected solar PV power plant for all the selected sites.

Table 4. Interest rates used in the economical feasibility analysis.

Table 5. Initial and periodic costs of the solar PV power plant.

Figure 6 Economic indicators for all sites.

Figure 6 Economic indicators for all sites.

Figure 7 Cost of electrical energy produced by the proposed 5 MW grid‐connected solar PV power plant at all locations.

Figure 7 Cost of electrical energy produced by the proposed 5 MW grid‐connected solar PV power plant at all locations.

Figure 8 GHG emissions mitigation as a result of utilising the proposed 5 MW grid‐connected solar PV power plant for electricity generation at all locations.

Figure 8 GHG emissions mitigation as a result of utilising the proposed 5 MW grid‐connected solar PV power plant for electricity generation at all locations.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.