459
Views
4
CrossRef citations to date
0
Altmetric
Articles

Model predictive lighting control for a factory building using a deep deterministic policy gradient

, ORCID Icon &
Pages 174-193 | Received 16 Oct 2021, Accepted 10 Dec 2021, Published online: 24 Jan 2022
 

Abstract

This paper presents an integrated lighting control that employs a daylit illuminance prediction model for a large, open-spaced factory building in which interactions between multiple luminaires and points of the workplane exist. The prediction model was developed with Radiance and consists of daylight and electric lighting prediction components. Both components showed reliable accuracy after calibration with measured illuminance (daylighting: MBE = 4.9%, CVRMSE = 24%; electric lighting: MBE = 3.7%, CVRMSE = 7.7%). An optimal policy trained by the deep deterministic policy gradient determines the dimming levels of multiple luminaire groups. The policy is developed with an artificial neural network model whose input is the current state (daylight distribution) and whose output is an action (lighting control variables). The model could provide an appropriate amount of electric lighting that meets the target illuminance and uniformity, while only 54% of the average consumption power (7,292 W) was needed compared with that of the existing rule-based control (13,629 W).

Acknowledgments

This work was supported by the Korea Institute of Energy Technology Evaluation and Planning (KETEP) and the Ministry of Trade, Industry & Energy(MOTIE) of the Republic of Korea (No. 20202020800360). This research was supported by Institute of Construction and Environmental Engineering at Seoul National University. The authors wish to express their gratitude for the support. The Institute of Engineering Research at Seoul National University provided research facilities for this work.

Disclosure statement

No potential conflict of interest was reported by the author(s).

Additional information

Funding

This work was supported by Korea Institute of Energy Technology Evaluation and Planning: [Grant Number 20202020800360]; The Institute of Engineering Research, Seoul National University: [Grant Number NA]; Institute of Construction and Environmental Engineering, Seoul National University: [Grant Number NA].

Log in via your institution

Log in to Taylor & Francis Online

PDF download + Online access

  • 48 hours access to article PDF & online version
  • Article PDF can be downloaded
  • Article PDF can be printed
USD 61.00 Add to cart

Issue Purchase

  • 30 days online access to complete issue
  • Article PDFs can be downloaded
  • Article PDFs can be printed
USD 297.00 Add to cart

* Local tax will be added as applicable

Related Research

People also read lists articles that other readers of this article have read.

Recommended articles lists articles that we recommend and is powered by our AI driven recommendation engine.

Cited by lists all citing articles based on Crossref citations.
Articles with the Crossref icon will open in a new tab.