466
Views
7
CrossRef citations to date
0
Altmetric
Original Articles

Seepage analysis of a diversion tunnel with high pressure in different periods: a case study

ORCID Icon, ORCID Icon, , , &
Pages 386-404 | Received 04 Jun 2015, Accepted 31 May 2016, Published online: 14 Jun 2016
 

Abstract

The seepage field for a diversion tunnel with high pressure in the Coca Codo Sinclair hydroelectric project is investigated using finite difference algorithms during periods of construction completion, operation and overhaul. The transient seepage calculation using FLAC3D is verified by a one-dimensional confined flow problem. The equivalent permeability coefficient of the lining, for which cracks are considered, is characterised with empirical formulas. The pressures of the internal and external surfaces of the lining and the external surface of the consolidation grouting region in each period are calculated. The maximum pressure difference between the lining region and the grouted region for each period are obtained. The effect of emptying speed on the seepage field in the emptying period is also discussed.

Log in via your institution

Log in to Taylor & Francis Online

PDF download + Online access

  • 48 hours access to article PDF & online version
  • Article PDF can be downloaded
  • Article PDF can be printed
USD 61.00 Add to cart

Issue Purchase

  • 30 days online access to complete issue
  • Article PDFs can be downloaded
  • Article PDFs can be printed
USD 229.00 Add to cart

* Local tax will be added as applicable

Related Research

People also read lists articles that other readers of this article have read.

Recommended articles lists articles that we recommend and is powered by our AI driven recommendation engine.

Cited by lists all citing articles based on Crossref citations.
Articles with the Crossref icon will open in a new tab.