Figures & data
Figure 8. (a) Structure and construction details. (b) Structure and construction-ventilated façade details.
![Figure 8. (a) Structure and construction details. (b) Structure and construction-ventilated façade details.](/cms/asset/a9f1ee7c-6bac-4eda-87e0-a93da18e5cec/rupt_a_2290055_f0008b_oc.jpg)
Figure 9. (a) Sustainable interventions of Proposed design. (b) Sustainable consideration of Proposed design.
![Figure 9. (a) Sustainable interventions of Proposed design. (b) Sustainable consideration of Proposed design.](/cms/asset/21182352-f439-4904-8a66-c0da493a3956/rupt_a_2290055_f0009b_oc.jpg)
Figure 10. (a) Sewage management for the Proposed design. (b) Electricity and water Provision for Proposed design.
![Figure 10. (a) Sewage management for the Proposed design. (b) Electricity and water Provision for Proposed design.](/cms/asset/42f61026-af69-4ed6-ad5a-b55b8fae5bc5/rupt_a_2290055_f0010b_oc.jpg)
Data availability statement
Data of this manuscript will be made available upon request