Enablers in the production system design process impacting operational performance

, , &
Pages 257-280 | Received 15 Jan 2022, Accepted 07 May 2022, Published online: 22 May 2022

Figures & data

Figure 1. The production system design process (modified from Bellgran and Säfsten (Citation2009)).

Figure 1. The production system design process (modified from Bellgran and Säfsten (Citation2009)).

Table 1. An overview of studies within the production system design process

Table 2. Enablers of the production system design process impacting operational performance

Table 3. Overview of data collection through interview

Table 4. Overview of the three case projects

Table 5. Additional enablers in the design phase impacting operational performance

Table 6. Impact on Ramp-up and operation phases by factors in the design phase

Table 7. Enablers in the design phase impacting operational performance in ramp-up and operation phases

Table 8. Criteria for linguistics criteria for cross-case analysis

Figure 2. OEE data for case project-B & project-C.

Figure 2. OEE data for case project-B & project-C.

Table 9. Cross case analysis

Figure 3. Operational performance-driven production system design process.

Figure 3. Operational performance-driven production system design process.