1,503
Views
6
CrossRef citations to date
0
Altmetric
Articles

Energy cost minimization in plant factories considering weather factors using additive Bayesian networks

, ORCID Icon, ORCID Icon, &
Pages 128-135 | Received 05 Dec 2017, Accepted 13 Feb 2018, Published online: 10 Jul 2018

Figures & data

Figure 1. Schematic image of a plant factory.

Figure 1. Schematic image of a plant factory.

Figure 2. Power consumption of a cultivation system.

Figure 2. Power consumption of a cultivation system.

Figure 3. Relationship of three variables.

Figure 3. Relationship of three variables.

Table 1. Variables investigated in the experiment.

Figure 4. Result of light period.

Figure 4. Result of light period.

Figure 5. Result of dark period.

Figure 5. Result of dark period.

Figure 6. Electricity price.

Figure 6. Electricity price.

Figure 7. Average power consumption of a cultivation system.

Figure 7. Average power consumption of a cultivation system.

Table 2. Relative power consumption and cost.

Figure 8. Number of cultivation systems starting at each time slot.

Figure 8. Number of cultivation systems starting at each time slot.

Figure 9. Power consumption of derived pattern and weather factors.

Figure 9. Power consumption of derived pattern and weather factors.