Implementation of hybrid parallel kanban-CONWIP system: A case study

& |
Article: 938922 | Received 25 Feb 2014, Accepted 09 Jun 2014, Published online: 31 Jul 2014

Figures & data

Figure 1. Flow of the methodology.

Figure 1. Flow of the methodology.

Figure 2. Current state VSM of p.

Figure 2. Current state VSM of p.

Figure 3. Parallel kanban-CONWIP system of p.

Figure 3. Parallel kanban-CONWIP system of p.

Figure 4. (a) Kanban card design; (b) Kanban card with card compartment in place; and (c) Paint shop kanban board.

Figure 4. (a) Kanban card design; (b) Kanban card with card compartment in place; and (c) Paint shop kanban board.

Figure 5. Subassembly SOP.

Figure 5. Subassembly SOP.

Table 1. Reduction/increment of kanban cards

Table 2. Lead time improvement of p

Figure 6. Future state VSM of p.