628
Views
0
CrossRef citations to date
0
Altmetric
Articles

Availability and cost-benefit evaluation for a repairable retrial system with warm standbys and priority

, , , &
Pages 164-175 | Received 24 May 2022, Accepted 21 Nov 2022, Published online: 05 Dec 2022

Figures & data

Figure 1. The repair schematic diagram of failed components.

Figure 1. The repair schematic diagram of failed components.

Figure 2. Effect of λ1 and λ2 on A().

Figure 2. Effect of λ1 and λ2 on A(∞).

Figure 3. Effect of λ1 and λ on A().

Figure 3. Effect of λ1 and λ on A(∞).

Figure 4. Effect of λ1 and μ on A().

Figure 4. Effect of λ1 and μ on A(∞).

Figure 5. Effect of λ1 and γ on A().

Figure 5. Effect of λ1 and γ on A(∞).

Figure 6. The effect of μ on E(N1), E(N2), Pb1 and Pb2.

Figure 6. The effect of μ on E(N1), E(N2), Pb1 and Pb2.

Figure 7. The effect of μ on cost-benefit ratio.

Figure 7. The effect of μ on cost-benefit ratio.