126
Views
37
CrossRef citations to date
0
Altmetric
General Paper

Metaheuristics for scheduling jobs with incompatible families on parallel batching machines

&
Pages 2083-2096 | Received 01 Jul 2010, Accepted 01 Nov 2010, Published online: 21 Dec 2017
 

Abstract

In this paper, we discuss the scheduling of jobs with incompatible families on parallel batching machines. The performance measure is total weighted tardiness. This research is motivated by a scheduling problem found in the diffusion and oxidation areas of semiconductor wafer fabrication where the machines can be modelled as parallel batch processors. Given that this scheduling problem is NP-hard, we suggest an ant colony optimization (ACO) and a variable neighbourhood search (VNS) approach. Both metaheuristics are hybridized with a decomposition heuristic and a local search scheme. We compare the performance of the two algorithms with that of a genetic algorithm (GA) based on extensive computational experiments. The VNS approach outperforms the ACO and GA approach with respect to time and solution quality.

Acknowledgements

The authors gratefully acknowledge the testing efforts of Markus Erhardt.

Log in via your institution

Log in to Taylor & Francis Online

PDF download + Online access

  • 48 hours access to article PDF & online version
  • Article PDF can be downloaded
  • Article PDF can be printed
USD 61.00 Add to cart

Issue Purchase

  • 30 days online access to complete issue
  • Article PDFs can be downloaded
  • Article PDFs can be printed
USD 277.00 Add to cart

* Local tax will be added as applicable

Related Research

People also read lists articles that other readers of this article have read.

Recommended articles lists articles that we recommend and is powered by our AI driven recommendation engine.

Cited by lists all citing articles based on Crossref citations.
Articles with the Crossref icon will open in a new tab.