Integrated methodology to design and manage work-in-process buffers in repetitive building projects

, &
Pages 1182-1193 | Received 01 Mar 2012, Accepted 01 Nov 2012, Published online: 21 Dec 2017
 

Abstract

An integrated methodology to design and manage buffers in repetitive building projects using work-in-process at conceptual level is proposed. The buffer design framework employs the Multiobjective Analytic Model and Simulation-Optimisation techniques, applied at strategic and tactical scheduling levels. The buffer management framework uses a statistical model to predict work progress, the Reliable Commitment Model, applied at operational scheduling level. The integrated methodology provides a new buffering approach for scheduling repetitive building projects, which considers: (1) a general production framework covering all the production levels from top to bottom; (2) a general modelling structure suitable to any type of repetitive building project; and (3) a sound theoretical and practical framework describing different production scenarios. The benefits of using this methodology are illustrated through a hypothetical project application.

Log in via your institution

Log in to Taylor & Francis Online

PDF download + Online access

  • 48 hours access to article PDF & online version
  • Article PDF can be downloaded
  • Article PDF can be printed
USD 61.00 Add to cart

Issue Purchase

  • 30 days online access to complete issue
  • Article PDFs can be downloaded
  • Article PDFs can be printed
USD 277.00 Add to cart

* Local tax will be added as applicable

Related Research

People also read lists articles that other readers of this article have read.

Recommended articles lists articles that we recommend and is powered by our AI driven recommendation engine.

Cited by lists all citing articles based on Crossref citations.
Articles with the Crossref icon will open in a new tab.