55
Views
11
CrossRef citations to date
0
Altmetric
Case-Oriented Paper

Scheduling for an arc-welding robot considering heat-caused distortion

, &
Pages 39-50 | Received 01 Dec 2003, Accepted 01 Apr 2004, Published online: 21 Dec 2017
 

Abstract

This paper focuses on an arc-welding robot scheduling problem, which is the problem of determining the sequence of welding operations while avoiding heat-caused distortion for the objective of minimizing the time required to complete a given set of welding operations. Each welding operation is specified by a weld line with two end points, each of which can be a possible starting point of the welding operation for that weld line. Because of the heat-caused distortion, there must be a certain period of time (delay) between welding operations associated with weld lines near each other. We develop several heuristic algorithms, in which heuristics for the travelling salesman problem are modified to cope with characteristics of the problem considered here. To show the performance of the heuristics suggested in this paper, computational experiments are performed on a number of randomly generated test problems and results are reported.

Log in via your institution

Log in to Taylor & Francis Online

PDF download + Online access

  • 48 hours access to article PDF & online version
  • Article PDF can be downloaded
  • Article PDF can be printed
USD 61.00 Add to cart

Issue Purchase

  • 30 days online access to complete issue
  • Article PDFs can be downloaded
  • Article PDFs can be printed
USD 277.00 Add to cart

* Local tax will be added as applicable

Related Research

People also read lists articles that other readers of this article have read.

Recommended articles lists articles that we recommend and is powered by our AI driven recommendation engine.

Cited by lists all citing articles based on Crossref citations.
Articles with the Crossref icon will open in a new tab.