91
Views
6
CrossRef citations to date
0
Altmetric
Case-Oriented Paper

Scheduling a hot rolling mill

, &
Pages 288-300 | Received 01 Nov 2004, Accepted 01 Oct 2005, Published online: 21 Dec 2017
 

Abstract

This paper presents a heuristic algorithm to schedule a hot rolling mill in the aluminum industry. One problematic issue is the tight coupling between the homogenizing furnaces and the mill, which needs to be integrated into the heuristic design. The latter also takes into account standard technological constraints like alloy hardness transitions, roll wear, homogenization code compatibilities and width transitions. The objective is to minimize the idle time on the mill and penalties for soft constraint violations related to production quality. The heuristic is divided into two phases. First, batches of ingots are constructed for the furnaces. These batches, called blocks, are then sequenced on the mill. Numerical results are reported on test instances derived from real-world data.

Acknowledgements

This research was supported by the Natural Sciences and Engineering Research Council of Canada (NSERC) and by Keops Technologies Inc. Their support is gratefully acknowledged.

Log in via your institution

Log in to Taylor & Francis Online

PDF download + Online access

  • 48 hours access to article PDF & online version
  • Article PDF can be downloaded
  • Article PDF can be printed
USD 61.00 Add to cart

Issue Purchase

  • 30 days online access to complete issue
  • Article PDFs can be downloaded
  • Article PDFs can be printed
USD 277.00 Add to cart

* Local tax will be added as applicable

Related Research

People also read lists articles that other readers of this article have read.

Recommended articles lists articles that we recommend and is powered by our AI driven recommendation engine.

Cited by lists all citing articles based on Crossref citations.
Articles with the Crossref icon will open in a new tab.