Publication Cover
The Engineering Economist
A Journal Devoted to the Problems of Capital Investment
Volume 54, 2009 - Issue 2
310
Views
4
CrossRef citations to date
0
Altmetric
Original Articles

Considering Risk Within Net Present Value: Calculations for Government Projects

, , &
Pages 152-174 | Published online: 20 May 2009
 

Abstract

The vision for space includes Shuttle retirement by 2010 and development of new launch vehicles; however, budget increases are not projected. To control costs additional insight into cost factors early in the system life cycle is needed. This article reports on a new launch vehicle upper-stage engine trade study where insight into cost factors was gained by using net present value and applying a set of risk factors to incorporate the risks inherent to key system life cycle phases. A matrix is presented that provides a general framework for assessing these risk levels. This approach shows the effects of various cost factors on the system cost and requires modest resource expenditures for the analysis itself.

Log in via your institution

Log in to Taylor & Francis Online

PDF download + Online access

  • 48 hours access to article PDF & online version
  • Article PDF can be downloaded
  • Article PDF can be printed
USD 61.00 Add to cart

Issue Purchase

  • 30 days online access to complete issue
  • Article PDFs can be downloaded
  • Article PDFs can be printed
USD 104.00 Add to cart

* Local tax will be added as applicable

Related Research

People also read lists articles that other readers of this article have read.

Recommended articles lists articles that we recommend and is powered by our AI driven recommendation engine.

Cited by lists all citing articles based on Crossref citations.
Articles with the Crossref icon will open in a new tab.