Wafer fabrication is the most complex phase in the semiconductor manufacturing process. Semiconductor wafer fabrication facilities (wafer fabs) contain re-entrant product flow through machines operating in parallel. Some of these machines incur sequence-dependent set-ups, while others are capable of processing multiple jobs in batches. This complex job shop can be modelled as a disjunctive graph, and then scheduled using a modified Shifting Bottleneck heuristic. The existence of the batch-processing machines in the complex job shop creates the potential for cyclic schedules to be produced by the modified Shifting Bottleneck approach, primarily due to the existence of dummy batching nodes and delayed precedence constraints. We propose a cycle elimination procedure to assist in maintaining schedule feasibility during the modified Shifting Bottleneck procedure.
Scheduling complex job shops using disjunctive graphs: A cycle elimination procedure
Reprints and Corporate Permissions
Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?
To request a reprint or corporate permissions for this article, please click on the relevant link below:
Academic Permissions
Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?
Obtain permissions instantly via Rightslink by clicking on the button below:
If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.
Related Research Data
Related research
People also read lists articles that other readers of this article have read.
Recommended articles lists articles that we recommend and is powered by our AI driven recommendation engine.
Cited by lists all citing articles based on Crossref citations.
Articles with the Crossref icon will open in a new tab.