216
Views
15
CrossRef citations to date
0
Altmetric
Original Articles

Scheduling complex job shops using disjunctive graphs: A cycle elimination procedure

&
Pages 981-994 | Published online: 14 Nov 2010
 

Wafer fabrication is the most complex phase in the semiconductor manufacturing process. Semiconductor wafer fabrication facilities (wafer fabs) contain re-entrant product flow through machines operating in parallel. Some of these machines incur sequence-dependent set-ups, while others are capable of processing multiple jobs in batches. This complex job shop can be modelled as a disjunctive graph, and then scheduled using a modified Shifting Bottleneck heuristic. The existence of the batch-processing machines in the complex job shop creates the potential for cyclic schedules to be produced by the modified Shifting Bottleneck approach, primarily due to the existence of dummy batching nodes and delayed precedence constraints. We propose a cycle elimination procedure to assist in maintaining schedule feasibility during the modified Shifting Bottleneck procedure.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.