343
Views
33
CrossRef citations to date
0
Altmetric
Original Articles

Solving the n-job 3-stage flexible flowshop scheduling problem using an agent-based approach

&
Pages 777-799 | Published online: 21 Feb 2007
 

Abstract

In this paper, a general methodology of agent-based manufacturing systems scheduling, incorporating game theoretic analysis of agent cooperation is presented to solve the n-job 3-stage flexible flowshop scheduling problem. The flowshops are flexible in the sense that a job can be processed by any of the identical machines at each stage. Our objective is to schedule a set of n jobs so as to minimize the makespan. We perform error bound analysis using the lower bound estimates developed in the literature as a datum for comparing the agent-based scheduling solutions with other heuristic solutions. The results of the evaluation show that the agent-based scheduling approach outperforms existing heuristics for the majority of the testing problems.

Log in via your institution

Log in to Taylor & Francis Online

PDF download + Online access

  • 48 hours access to article PDF & online version
  • Article PDF can be downloaded
  • Article PDF can be printed
USD 61.00 Add to cart

Issue Purchase

  • 30 days online access to complete issue
  • Article PDFs can be downloaded
  • Article PDFs can be printed
USD 973.00 Add to cart

* Local tax will be added as applicable

Related Research

People also read lists articles that other readers of this article have read.

Recommended articles lists articles that we recommend and is powered by our AI driven recommendation engine.

Cited by lists all citing articles based on Crossref citations.
Articles with the Crossref icon will open in a new tab.