85
Views
7
CrossRef citations to date
0
Altmetric
Original Articles

Time bucket length and lot-splitting approach

Pages 2325-2338 | Published online: 21 Feb 2007
 

Abstract

The effect of time bucket length on the choice of a lot-splitting approach is studied. Due to the continuing pressure to reduce throughput times and increase efficiency, managers apply various measures, such as lot splitting and cycle time reduction programmes, that change the length of the time bucket in their planning systems. It is shown that the choice for a suitable lot-splitting approach depends on the time bucket length used, so these measures cannot be treated independently as costs may increase rapidly without substantial effect on throughput times. Moreover, the current belief in the lot-splitting literature that the improvements of a variable lot-splitting approach are only marginal compared with an equal sub-batch approach is challenged. Some papers estimate the possible flow time improvement to be less than 5%. It is shown that such statements are not valid as the improvement depends strongly on the type of equal sub-batch strategy applied and the length of the time bucket. Moreover, flow time improvements are accompanied by extra transfer costs, so a cost perspective that includes both effects is more appropriate. The paper shows that equal sub-batching is only effective if information on the time bucket length and on product characteristics is included. At time bucket lengths between one and three days, costs are very sensitive for the type of sub-batching strategy applied. Simulation experiments show that variable sub-batching leads to average cost improvements from 3 to 11%, depending on the time bucket length and the equal sub-batch strategy applied. Lower costs are due to throughput time reductions and transfer cost savings.

Log in via your institution

Log in to Taylor & Francis Online

PDF download + Online access

  • 48 hours access to article PDF & online version
  • Article PDF can be downloaded
  • Article PDF can be printed
USD 61.00 Add to cart

Issue Purchase

  • 30 days online access to complete issue
  • Article PDFs can be downloaded
  • Article PDFs can be printed
USD 973.00 Add to cart

* Local tax will be added as applicable

Related Research

People also read lists articles that other readers of this article have read.

Recommended articles lists articles that we recommend and is powered by our AI driven recommendation engine.

Cited by lists all citing articles based on Crossref citations.
Articles with the Crossref icon will open in a new tab.