5,987
Views
59
CrossRef citations to date
0
Altmetric
Original Articles

Kaizen costing for lean manufacturing: a case study

, &
Pages 1751-1760 | Received 01 Oct 2004, Published online: 22 Feb 2007
 

Abstract

In the past decade due to increasing global competition US firms have radically changed their manufacturing practices to improve their competitiveness. In pursuing this goal they have adopted a number of advanced techniques, such as just-in-time, total quality management, lean manufacturing, flexible manufacturing systems, process improvement, and design for manufacturability, to name a few. The objectives of all these programmes have been to reduce cost, improve quality, reduce cycle time, and increase flexibility on the factory floor. Support systems such as finance and cost management, however, have generally not kept pace with the level of corresponding operational changes being implemented. This paper presents a case study of kaizen costing as practised by Boeing Commercial Airplane Company, IRC Division. The purpose of this study is to describe a method used to set kaizen costs which will provide relevant cost data to support lean production decisions that would be useful to practitioners.

Log in via your institution

Log in to Taylor & Francis Online

PDF download + Online access

  • 48 hours access to article PDF & online version
  • Article PDF can be downloaded
  • Article PDF can be printed
USD 61.00 Add to cart

Issue Purchase

  • 30 days online access to complete issue
  • Article PDFs can be downloaded
  • Article PDFs can be printed
USD 973.00 Add to cart

* Local tax will be added as applicable

Related Research

People also read lists articles that other readers of this article have read.

Recommended articles lists articles that we recommend and is powered by our AI driven recommendation engine.

Cited by lists all citing articles based on Crossref citations.
Articles with the Crossref icon will open in a new tab.