Capacity-constrained production scheduling of multiple vehicle programs in an automotive pilot plant

Pages 2573-2604 | Received 01 Nov 2005, Published online: 22 Feb 2007
 

Abstract

This paper describes a simulation-based approach for scheduling a simultaneously-run mix of multiple vehicle programs in an automotive pilot plant with multiple operational constraints. Pilot plants often operate with relatively long and highly variable cycle times, equipment failures and labour absenteeism, dedication schemes of assembly resources, frequent engineering changes and sign-offs, low inventory levels, and long sequence-dependent setups (programs ramp-up and changeover). Such characteristics often lead a stochastic process response and result in significant capacity limitations and scheduling inefficiencies. Hence, an approach is presented in this paper to resolve capacity complications in the pilot plant and to increase the efficiency of the production schedule. Because of the organic capacity–schedule relationship, the proposed approach is referred to as capacity-constrained production scheduling (CPS). Discrete event simulation (DES) is utilised to determine the plant's effective production capacity under the plant operational constraints and stochastic running conditions. A set of model-generated CPS measures with critical capacity and scheduling indications are defined to quantify potential imbalances between the plant's effective capacity and the demand-based schedule capacity. The plant capacity is improved systematically by elevating plant constraints through the application of a simulation-based theory of constraints (TOC) method. A resource reallocation algorithm (RRA) is applied to enhance the efficiency of the production schedule in terms of delivery shortages, idle time, makespan, and tardiness. An automotive pilot plant case study is presented to clarify the application and the benefits of the proposed approach with a focus on the details of the practical application of TOC and RRA.

Acknowledgements

The author gratefully acknowledges the referees who helped to clarify and improve the paper presentation.

Log in via your institution

Log in to Taylor & Francis Online

PDF download + Online access

  • 48 hours access to article PDF & online version
  • Article PDF can be downloaded
  • Article PDF can be printed
USD 61.00 Add to cart

Issue Purchase

  • 30 days online access to complete issue
  • Article PDFs can be downloaded
  • Article PDFs can be printed
USD 973.00 Add to cart

* Local tax will be added as applicable

Related Research

People also read lists articles that other readers of this article have read.

Recommended articles lists articles that we recommend and is powered by our AI driven recommendation engine.

Cited by lists all citing articles based on Crossref citations.
Articles with the Crossref icon will open in a new tab.