166
Views
13
CrossRef citations to date
0
Altmetric
Original Articles

Analysis of standard ordering policies within the framework of MRP theory

&
Pages 3759-3773 | Published online: 06 Oct 2011
 

Abstract

A number of different standard ordering policies are presented within the methodology of Material Requirements Planning (MRP), such as Lot-For-Lot (L4L), Fixed Order Quantity (FOQ), Fixed Period Requirements (FPR), etc. In MRP theory the time development of the production-inventory system is determined by a set of fundamental equations for available inventory, total inventory and backlogs using Input–Output Analysis for capturing the Bill of Materials and Laplace transforms for describing the advanced timing requirements. This paper aims at formally introducing standard ordering policies into the fundamental equations of MRP Theory in order to analyse the possibility to obtain closed-form expressions for the time development of the system, when such rules are applied.

Log in via your institution

Log in to Taylor & Francis Online

PDF download + Online access

  • 48 hours access to article PDF & online version
  • Article PDF can be downloaded
  • Article PDF can be printed
USD 61.00 Add to cart

Issue Purchase

  • 30 days online access to complete issue
  • Article PDFs can be downloaded
  • Article PDFs can be printed
USD 973.00 Add to cart

* Local tax will be added as applicable

Related Research

People also read lists articles that other readers of this article have read.

Recommended articles lists articles that we recommend and is powered by our AI driven recommendation engine.

Cited by lists all citing articles based on Crossref citations.
Articles with the Crossref icon will open in a new tab.