270
Views
19
CrossRef citations to date
0
Altmetric
Original Articles

A new complexity proof for the two-stage hybrid flow shop scheduling problem with dedicated machines

Pages 1531-1538 | Received 28 Jul 2008, Accepted 11 Dec 2008, Published online: 16 Mar 2009
 

Abstract

This paper considers a two-stage hybrid flow shop scheduling problem with dedicated machines at stage 2. The objective is to minimise the makespan. There is one machine at stage 1 and two machines at stage 2. Each job must be processed on the single machine at stage 1 and, depending upon the job type, the job is processed on either of the two machines at stage 2. We first introduce this special type of the two-stage hybrid flow shop scheduling problem and present some preliminary results. We then present a counter example to the known complexity proof of Riane et al. [Riane, F., Artiba, A. and Elmaghraby, S.E., 2002. Sequencing a hybrid two-stage flowshop with dedicated machines. International Journal of Production Research, 40, 4353–4380.] Finally, we re-establish the complexity of the problem.

Log in via your institution

Log in to Taylor & Francis Online

PDF download + Online access

  • 48 hours access to article PDF & online version
  • Article PDF can be downloaded
  • Article PDF can be printed
USD 61.00 Add to cart

Issue Purchase

  • 30 days online access to complete issue
  • Article PDFs can be downloaded
  • Article PDFs can be printed
USD 973.00 Add to cart

* Local tax will be added as applicable

Related Research

People also read lists articles that other readers of this article have read.

Recommended articles lists articles that we recommend and is powered by our AI driven recommendation engine.

Cited by lists all citing articles based on Crossref citations.
Articles with the Crossref icon will open in a new tab.