957
Views
25
CrossRef citations to date
0
Altmetric
Original Articles

Optimising and simulating the assembly line balancing problem in a motorcycle manufacturing company: a case study

, &
Pages 3637-3656 | Received 16 Jan 2009, Accepted 24 Mar 2009, Published online: 10 Jun 2009
 

Abstract

In this paper, we present a real life assembly line balancing problem for a motorcycle manufacturing company. Results from the initial situation in the company are compared to those provided by a heuristic method and by a novel neighbourhood search method. An ARENA simulation model is developed to test the different proposals. The model was validated by comparing the simulation results from the initial company scenario with the real operation results. Consequently, the extension to the developed proposals allows us to select an adequate assembly line for the company, resulting in a greater productivity level and a more balanced line with respect to the operation times in the stations and the activity of the workers. The company has subsequently implemented our proposed schedule, obtaining remarkable improvements in its productivity.

Log in via your institution

Log in to Taylor & Francis Online

PDF download + Online access

  • 48 hours access to article PDF & online version
  • Article PDF can be downloaded
  • Article PDF can be printed
USD 61.00 Add to cart

Issue Purchase

  • 30 days online access to complete issue
  • Article PDFs can be downloaded
  • Article PDFs can be printed
USD 973.00 Add to cart

* Local tax will be added as applicable

Related Research

People also read lists articles that other readers of this article have read.

Recommended articles lists articles that we recommend and is powered by our AI driven recommendation engine.

Cited by lists all citing articles based on Crossref citations.
Articles with the Crossref icon will open in a new tab.