A heuristic for multi-level lot-sizing problems with a bottleneck

&
Pages 787-798 | Received 01 Jun 1991, Published online: 23 Mar 2012
 

Abstract

A simple heuristic is proposed for multi-level lot-sizing problems where there is a bottleneck. Previous methods to solve this problem have formulated the problem as an integer programming problem and solved the problem using a Lagrangian relaxation embedded within the branch and bound procedure. In this paper we suggest that items to be produced can be grouped into two types and a simple but efficient heuristic can be used to determine the production quantities required. A program was developed to compute production levels and was found to require only a small fraction of the computer time required by the full integer programming approach, and to produce solutions of reasonable quality. The heuristic is simple to implement.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.