Aggregate production planning for shipbuilding with variation-inventory trade-offs

, &
Pages 6249-6272 | Received 29 Jan 2010, Accepted 14 Sep 2010, Published online: 24 Jan 2011
 

Abstract

Shipbuilding is a complex production system characterised by a complicated work and organisation structure, prolonged production lead time, and heterogeneous resource requirements. Thus, effectively planning all involved activities presents a challenging task and requires the timely coordination between the successive production stages at the plant level and effective resource allocation at the workshop level. With the work breakdown structure of all projects and their corresponding building strategies, the aggregate production planning (APP) is to address two important issues, namely, workforce level and inventory usage so that the fluctuating demands from downstream processes can be satisfied in a cost-effective manner. To achieve this, a novel APP model is proposed for ship production to minimise the variation of aggregate man-hour over the planning horizon and simultaneously minimise the logistic demands of the interim products. In view of the combinatorial nature and computational complexity, a directed genetic algorithm based solver has been developed to solve the two-conflicting-objective optimisation problem. The proposed approach has been applied to a case study and preliminary results have shown certain effectiveness in handling various situations with different planning strategies.

Acknowledgements

We are most grateful to the staff from Singapore Sembcorp Marine Ltd for their cooperation in knowledge acquisition and valuable feedback in the case study. Also, we would like to express sincere thanks to the anonymous referees for their constructive comments in improving the article.

Log in via your institution

Log in to Taylor & Francis Online

PDF download + Online access

  • 48 hours access to article PDF & online version
  • Article PDF can be downloaded
  • Article PDF can be printed
USD 61.00 Add to cart

Issue Purchase

  • 30 days online access to complete issue
  • Article PDFs can be downloaded
  • Article PDFs can be printed
USD 973.00 Add to cart

* Local tax will be added as applicable

Related Research

People also read lists articles that other readers of this article have read.

Recommended articles lists articles that we recommend and is powered by our AI driven recommendation engine.

Cited by lists all citing articles based on Crossref citations.
Articles with the Crossref icon will open in a new tab.