435
Views
3
CrossRef citations to date
0
Altmetric
Original Articles

Modelling and optimisation of assembly processes

, &
Pages 4317-4333 | Received 29 Apr 2010, Accepted 26 Nov 2010, Published online: 18 Mar 2011
 

Abstract

The following article is a case study for scheduling of assembly processes. Two optimisation methods, mixed integer programming solver and heuristic simulation-based optimisation are compared to each other. It can be shown, up to which model complexity the solver methods have the advantage over the simulation-based methods concerning a possible online application. Both the mathematical formulation as well as the discrete event simulation system, bases on a meta-model – a special Petri net. It is shown that bipartite graphs, i.e. Petri nets, avoid ambiguities in the case of alternative assembly sequences and have advantages in comparison to the usual simple precedence graphs. The results of optimisation experiments are described by the example of assembling a numeric controlled milling table. The model is capable of reflecting multiple parallel assembly processes, alternative assembly steps and can predict characteristics like utilisation, stock or adherence to schedules.

Log in via your institution

Log in to Taylor & Francis Online

PDF download + Online access

  • 48 hours access to article PDF & online version
  • Article PDF can be downloaded
  • Article PDF can be printed
USD 61.00 Add to cart

Issue Purchase

  • 30 days online access to complete issue
  • Article PDFs can be downloaded
  • Article PDFs can be printed
USD 973.00 Add to cart

* Local tax will be added as applicable

Related Research

People also read lists articles that other readers of this article have read.

Recommended articles lists articles that we recommend and is powered by our AI driven recommendation engine.

Cited by lists all citing articles based on Crossref citations.
Articles with the Crossref icon will open in a new tab.