Production rescheduling for machine breakdown at a job shop

&
Pages 2681-2691 | Received 14 Jun 2010, Accepted 24 Mar 2011, Published online: 07 Jul 2011
 

Abstract

Rescheduling is a procedure to repair a production plan affected by unexpected disruptions. It is important because a production schedule released to a shop floor is subject to unexpected disruptions. This paper develops two novel heuristic rescheduling procedures, AWI-J and AWI-O, to minimise mean tardiness of jobs in a job shop. The procedures are based on an active schedule-generation procedure and Wilkerson–Irwin algorithm, which is well known for minimising mean tardiness of a schedule. The performances of the new procedures are compared with those of the Affected Operations Rescheduling (AOR) procedure, which is popular in the rescheduling literature. Efficiency measures such as mean tardiness, mean flowtime, and makespan, and a stability measure, deviation of new operation start times from the original start times, are used for comparison. Test results show that AWI-J improves efficiency over AOR, and AWI-O improves efficiency and stability as well.

Log in via your institution

Log in to Taylor & Francis Online

PDF download + Online access

  • 48 hours access to article PDF & online version
  • Article PDF can be downloaded
  • Article PDF can be printed
USD 61.00 Add to cart

Issue Purchase

  • 30 days online access to complete issue
  • Article PDFs can be downloaded
  • Article PDFs can be printed
USD 973.00 Add to cart

* Local tax will be added as applicable

Related Research

People also read lists articles that other readers of this article have read.

Recommended articles lists articles that we recommend and is powered by our AI driven recommendation engine.

Cited by lists all citing articles based on Crossref citations.
Articles with the Crossref icon will open in a new tab.