Material and capacity requirements planning with dynamic lead times

&
Pages 4477-4492 | Received 10 Sep 2010, Accepted 27 Jun 2011, Published online: 23 Aug 2011
 

Abstract

Traditional material requirements planning (MRP) does not consider the finite capacity of machines, and assumes fixed lead times. This paper develops an approach (material and capacity requirements planning; MCRP) to integrate capacity planning into MRP. To obtain a capacity feasible production plan, different measures for capacity adjustment such as alternative routeings, safety stock, lot splitting and lot summarisation, are discussed. Additionally, lead times are no longer assumed to be fixed. They are calculated dynamically with respect to machine capacity utilisation. A detailed example is presented to illustrate how the MCRP approach works successfully.

Log in via your institution

Log in to Taylor & Francis Online

PDF download + Online access

  • 48 hours access to article PDF & online version
  • Article PDF can be downloaded
  • Article PDF can be printed
USD 61.00 Add to cart

Issue Purchase

  • 30 days online access to complete issue
  • Article PDFs can be downloaded
  • Article PDFs can be printed
USD 973.00 Add to cart

* Local tax will be added as applicable

Related Research

People also read lists articles that other readers of this article have read.

Recommended articles lists articles that we recommend and is powered by our AI driven recommendation engine.

Cited by lists all citing articles based on Crossref citations.
Articles with the Crossref icon will open in a new tab.