Research on a JIT scheduling problem in parallel motorcycle assembly lines considering actual situations

, , &
Pages 4923-4936 | Received 24 Jan 2011, Accepted 05 Aug 2011, Published online: 27 Sep 2011
 

Abstract

After the research of schedule problem of one kind of flexible motorcycle assembly lines, a kind of parallel conveyor belt flow shop schedule model using JIT (just-in-time) is given. The impacts of the different max process paces of different work pieces in different stations are considered. Besides, some actual situations, including unstable information and structural constrain, are also considered. Then a kind of improved artificial fish swarm algorithm based on polar coordinate coding is presented to optimise this schedule model. Lastly, this model is tested with the real data from two motorcycle assembly lines, and the result shows that the total production fee is reduced.

Acknowledgements

The work reported in this paper is supported by the National High Technology Research and Development Program of China (863 Program) under Grant No. 2006AA04A124.

Log in via your institution

Log in to Taylor & Francis Online

PDF download + Online access

  • 48 hours access to article PDF & online version
  • Article PDF can be downloaded
  • Article PDF can be printed
USD 61.00 Add to cart

Issue Purchase

  • 30 days online access to complete issue
  • Article PDFs can be downloaded
  • Article PDFs can be printed
USD 973.00 Add to cart

* Local tax will be added as applicable

Related Research

People also read lists articles that other readers of this article have read.

Recommended articles lists articles that we recommend and is powered by our AI driven recommendation engine.

Cited by lists all citing articles based on Crossref citations.
Articles with the Crossref icon will open in a new tab.