550
Views
41
CrossRef citations to date
0
Altmetric
Original Articles

Makespan minimisation on parallel batch processing machines with non-identical job sizes and release dates

, , &
Pages 6022-6035 | Received 04 Jul 2011, Accepted 02 Nov 2011, Published online: 21 Dec 2011
 

Abstract

The problem we study in this paper arises from the washing step of hospital sterilisation services. Washers in the washing step are capable of handling more than one medical device set as long as their capacity is not exceeded. The medical device set sizes and arrival times to the sterilisation service may be different, but they all have the same washing duration. Thus, we model the washing step as a batch scheduling problem where medical device sets are treated as jobs with non-identical sizes and release dates, but equal processing times. The main findings we present in this paper are the following. First, we study two special cases for which polynomial algorithms are presented. We then develop a 2-approximation algorithm for the general problem. Finally, we develop a MILP model and compare it with another MILP model from the literature. Computational results show that our MILP model outperforms the model from the literature.

Log in via your institution

Log in to Taylor & Francis Online

PDF download + Online access

  • 48 hours access to article PDF & online version
  • Article PDF can be downloaded
  • Article PDF can be printed
USD 61.00 Add to cart

Issue Purchase

  • 30 days online access to complete issue
  • Article PDFs can be downloaded
  • Article PDFs can be printed
USD 973.00 Add to cart

* Local tax will be added as applicable

Related Research

People also read lists articles that other readers of this article have read.

Recommended articles lists articles that we recommend and is powered by our AI driven recommendation engine.

Cited by lists all citing articles based on Crossref citations.
Articles with the Crossref icon will open in a new tab.