315
Views
10
CrossRef citations to date
0
Altmetric
Articles

Multi-period lot sizing and job shop scheduling with compressible process times for multilevel product structures

, , &
Pages 6229-6246 | Received 18 Jun 2012, Accepted 26 Jun 2013, Published online: 08 Aug 2013
 

Abstract

This paper presents mathematical modelling of joint lot sizing and scheduling problem in job shop environment under a set of working conditions. The main feature of the problem is to deal with flexible machines able to change their working speeds, known as process compressibility. Furthermore, produced items should be assembled together to make final products. In other words, the products have a multilevel structure, shown with bill of materials. As the problem is proved to be strongly NP-hard, it is solved by a memetic algorithm here. Computational experiences on the data of ‘Mega Motor’ company are reported. Also, further experiences on random test data confirm the performance of the proposed method with less than 5.02% optimality gap while solving the problems in very shorter times than CPLEX 12.0.

Log in via your institution

Log in to Taylor & Francis Online

PDF download + Online access

  • 48 hours access to article PDF & online version
  • Article PDF can be downloaded
  • Article PDF can be printed
USD 61.00 Add to cart

Issue Purchase

  • 30 days online access to complete issue
  • Article PDFs can be downloaded
  • Article PDFs can be printed
USD 973.00 Add to cart

* Local tax will be added as applicable

Related Research

People also read lists articles that other readers of this article have read.

Recommended articles lists articles that we recommend and is powered by our AI driven recommendation engine.

Cited by lists all citing articles based on Crossref citations.
Articles with the Crossref icon will open in a new tab.