Abstract
In real world, line balancing involves existing lines in existing factories and the line typically needs to be rebalanced rather than balanced. Rebalancing of a U-line can be defined as a changeover process from its initial configuration to a new configuration for a while due to the reasons such as demand variations, changes in product design and changes in task times, etc. This study defines U-line rebalancing problem with stochastic task times and proposes a solution procedure based on ant colony optimisation. The objective of the proposed algorithm is to minimise total cost of rebalancing which is the sum of task transposition costs, workstation opening/closing costs and operating costs of workstations for a particular planning horizon. A comprehensive experiment is conducted to generate problem instances and to compare rebalancing costs of U-lines by means of several factors. A total of 6600 rebalancing solutions are obtained and several comparisons are performed.
Acknowledgements
The authors would like to thank the anonymous reviewers for their valuable comments and suggested improvements on the paper.