Two-stage flow shop scheduling with dedicated machines

Pages 1094-1097 | Received 23 Mar 2014, Accepted 09 Jul 2014, Published online: 05 Aug 2014
 

Abstract

This study is concerned with the manufacturing model that has a common machine at stage one and two parallel dedicated machines at stage two. All jobs need to be processed on the stage-one common machine. After the stage-one processing, the jobs of type 1 (type 2) will route to the first (second) dedicated machine at stage two. We first elaborate several published works on makespan minimisation which are not known to other streams of recent works. While the minimisation of maximum lateness is strongly NP-hard, we develop a linear-time algorithm to solve the case where two sequences of the two job types are given a priori.

Acknowledgement

The author is grateful to the anonymous referees who pinpointed typos and provided suggestions for improving the presentation of an earlier version.

Notes

1 This research was supported in part by the National Science Council of Taiwan under grant NSC102-2923-H-009 -001-MY3.

Log in via your institution

Log in to Taylor & Francis Online

PDF download + Online access

  • 48 hours access to article PDF & online version
  • Article PDF can be downloaded
  • Article PDF can be printed
USD 61.00 Add to cart

Issue Purchase

  • 30 days online access to complete issue
  • Article PDFs can be downloaded
  • Article PDFs can be printed
USD 973.00 Add to cart

* Local tax will be added as applicable

Related Research

People also read lists articles that other readers of this article have read.

Recommended articles lists articles that we recommend and is powered by our AI driven recommendation engine.

Cited by lists all citing articles based on Crossref citations.
Articles with the Crossref icon will open in a new tab.