432
Views
12
CrossRef citations to date
0
Altmetric
Articles

A parallel machine lot-sizing and scheduling problem with a secondary resource and cumulative demand

ORCID Icon, &
Pages 3344-3357 | Received 04 Jun 2017, Accepted 07 Nov 2017, Published online: 05 Dec 2017
 

Abstract

We investigate a parallel machine multi-item lot-sizing and scheduling problem with a secondary resource, in which demands are given for the entire planning horizon rather than for every single period. All-or-nothing assumption of the discrete lot-sizing and scheduling problem is valid so that a machine is either idle or works at full capacity in a period. The objective is to minimise the number of setups and teardowns. We prove that the problem is NP-hard and present two equivalent formulations. We show some properties of the optimal objective value, give optimality conditions and suggest a heuristic algorithm. We discuss and formulate two possible extensions related to real-life applications. Finally, we carry out computational experiments to compare the two formulations, to determine the effect of our proposed modeling improvements on solution performance, and to test the quality of our heuristic.

Notes

No potential conflict of interest was reported by the authors.

Log in via your institution

Log in to Taylor & Francis Online

PDF download + Online access

  • 48 hours access to article PDF & online version
  • Article PDF can be downloaded
  • Article PDF can be printed
USD 61.00 Add to cart

Issue Purchase

  • 30 days online access to complete issue
  • Article PDFs can be downloaded
  • Article PDFs can be printed
USD 973.00 Add to cart

* Local tax will be added as applicable

Related Research

People also read lists articles that other readers of this article have read.

Recommended articles lists articles that we recommend and is powered by our AI driven recommendation engine.

Cited by lists all citing articles based on Crossref citations.
Articles with the Crossref icon will open in a new tab.