643
Views
9
CrossRef citations to date
0
Altmetric
Articles

Effectiveness of nervousness reduction policies when capacity is constrained

&
Pages 4121-4137 | Received 14 Mar 2019, Accepted 08 Jul 2019, Published online: 25 Jul 2019
 

Abstract

A number of studies have examined a variety of solutions for overcoming master production schedule nervousness which is a major cause of cost increase and material flow disruption throughout the supply chain. The study reported in this paper provides a comprehensive review of the literature and provides insights on the effect of capacity constraints on the effectiveness of policies for dampening schedule nervousness. The insights on the impact of capacity constraints are then confirmed via a simulation study investigating the effectiveness of three nervousness reduction policies. The relative effectiveness of the policies (freezing a portion of the schedule, using safety stock at the end item level, and a combination policy of freezing and safety stock) are examined under a variety of conditions characterised by variations in the level of demand uncertainty faced by the system and product structure complexity.

Disclosure statement

No potential conflict of interest was reported by the authors.

Log in via your institution

Log in to Taylor & Francis Online

PDF download + Online access

  • 48 hours access to article PDF & online version
  • Article PDF can be downloaded
  • Article PDF can be printed
USD 61.00 Add to cart

Issue Purchase

  • 30 days online access to complete issue
  • Article PDFs can be downloaded
  • Article PDFs can be printed
USD 973.00 Add to cart

* Local tax will be added as applicable

Related Research

People also read lists articles that other readers of this article have read.

Recommended articles lists articles that we recommend and is powered by our AI driven recommendation engine.

Cited by lists all citing articles based on Crossref citations.
Articles with the Crossref icon will open in a new tab.