Job shop scheduling heuristics and frequency of scheduling

, &
Pages 227-241 | Received 12 Dec 1981, Published online: 06 Apr 2007
 

Abstract

This paper presents a job scheduling problem. Two important aspects are included in the subsequent analysis. The first is the dynamic nature whereby new jobs arrive to be included intermittently through time. The second is the uncertainty, or error in estimating process times, and the likelihood of machine breakdown. An experiment is presented which shows the performance of a number of heuristics in the form of dispatching disciplines under different scheduling conditions which are determined by the scheduling period and the level of uncertainty in the process times and machine breakdowns. Various different measures of performance which could be of importance to management are considered. These include mean ratio of flow time to process time, mean queueing time, mean lateness, percentage of jobs late and net CPU times required to generate schedules in the simulation process.

Results are presented showing the relationship between the performance of the heuristics relative to the different measures and the rescheduling period. These are discussed in the more general managerial context.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.