25
Views
0
CrossRef citations to date
0
Altmetric
Original Articles

A simulation approach for adapting a production line balancing procedure to a probabilistic environment

&
Pages 787-801 | Received 30 Sep 1981, Published online: 06 Apr 2007
 

Abstract

Many of the line balancing procedures at present available have several limiting characteristics. First, they often tend to be based on approaches that encompass deterministic operating parameters when, in fact, realistic production systems have probabilistic operating parameters. Secondly, they are often applicable only to small noncomplex production lines. It is the purpose of this paper to demonstrate how Q-GERT network modelling and simulation can be employed to ascertain the effect of these realistic operating conditions on a line balancing procedure. Once such effects have been determined it will be shown how simulation can be used to adapt the line balancing procedure to realistic operating conditions.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.