105
Views
162
CrossRef citations to date
0
Altmetric
Original Articles

A loading and dispatching problem in a random flexible manufacturing system

&
Pages 579-595 | Received 01 Apr 1984, Published online: 22 Oct 2007
 

Abstract

A scheduling problem in a flexible manufacturing system (FMS) is considered to be a composite of two interdependent tasks: loading and sequencing. Formulations are presented for the loading problem with two objectives:

(i) minimization of the system workload unbalance, and

(ii) minimization of system unbalance and the number of late jobs;

including constraints such as the number of tools slots with duplications, unique job routing, nonsplitting of jobs and machine capacity. For both the objectives, heuristic methods are developed and performance is compared with the exact mixed integer programming solutions. A simulation model is developed for investigating the system performance for the problem of minimizing the system unbalance using heuristic and sequential loading methods in conjunction with four—FIFO, SPT, LPT and MOPR—dispatching rules.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.