104
Views
47
CrossRef citations to date
0
Altmetric
Original Articles

A system dynamics model for a multi-stage multi-line dual-card JIT-kanban system

&
Pages 309-352 | Published online: 28 Mar 2007
 

SUMMARY

Just-in-time production systems are gaining tremendous popularity in modern production environments. Based on the concept of producing exactly the required quantity and type of products, these systems display an excellent ability to adapt to changes in demand as well as permitting greatly reduced work-in-process inventories.

JIT systems often make reference to ‘kanbans’, which are the inventory control cards used in most JIT environments. A JIT-kanban system is one where production is pulled through the process rather than conventional materials requirements planning push. This fundamental difference is what gives JIT-kanban systems their unique characteristics.

This paper investigates some of these unique characteristics of JIT-kanban systems by way of a dynamic simulation model. Using system-dynamic concepts, the behaviour of the system under the stimulus of various exogeneous factors is demonstrated.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.