60
Views
47
CrossRef citations to date
0
Altmetric
Original Articles

The effects of product structure and sequencing rule on assembly shop performance

, , &
Pages 671-686 | Received 01 Dec 1987, Published online: 29 Mar 2007
 

SUMMARY

Single-stage job-shop scheduling has received a great deal of attention in the published literature. Significantly less research has been done in the area of assembly job shops. With the onslaught of MRP implementations designed to plan and control assembly job shops, practitioners have been confronted head-on with the need to improve dispatching procedures. This paper examines the effect of three different product structures on the performance of selected priority dispatching rules in a six-machine assembly job shop. Results indicate that significant relationships exist between the structure of the product bill of materials and the priority dispatching rule, and that specific rules are indeed better suited to certain product structures.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.