44
Views
40
CrossRef citations to date
0
Altmetric
Original Articles

A preliminary investigation of multi-attribute based sequencing rules for assembly shops

, &
Pages 739-753 | Published online: 27 Apr 2007
 

Abstract

This paper updates the current literature on assembly shop scheduling to include multi-attribute based sequencing rules that have recently been introduced and measures of shop performance that more accurately reflect management's view toward tardiness and inventory. In addition, a new set of sequencing rules, called importance ratio (IR), is proposed. The operation of a hypothetical assembly shop is simulated to test the performance of eight sequencing rules on three distinct sets of product structures. Four measures of system inventory and four measures of job tardiness are used to evaluate sequencing rule performance. The study shows that sequencing rules which incorporate attributes of both job shop and assembly shop scheduling do not necessarily produce the best performance. Moreover, multiple measures of inventory and tardiness performance do provide important insight into the operation and particular benefits of different sequencing rules. Finally, the importance ratio rules introduced are viable candidates for assembly shops and are especially appropriate for jobs with many levels of assembly.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.