34
Views
2
CrossRef citations to date
0
Altmetric
Original Articles

Comparing trigger and kanban control of flow-line manufacture

Pages 2351-2362 | Received 01 Dec 1991, Published online: 16 May 2007
 

Abstract

The implementation of ‘kanban’ inventory control systems, originally developed in Japan by Toyota, in flow-line manufacture has been widely described. It is generally asserted that kanbans are an efficient method of controlling flow-line assembly systems with consistent demands. This paper describes work carried out in association with Jaguar Cars Limited to develop a steady-state Markovian model for calculating the number of kanbans required to control single-stage processes feeding assembly lines. A Markovian model of an alternative just-in-time system, in which the off-line process is triggered by the passage of vehicle bodies past a point prior to the assembly area, is also described. The use of these models has shown that the use of a trigger system leads to lower inventory levels and greater pressure for improvement than a kanban system

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.