Scheduling for machining and assembly in a job-shop environment

, &
Pages 1275-1297 | Published online: 27 Apr 2007
 

Abstract

The problem of scheduling n assembly jobs in a job-shop environment is addressed. Each job is characterized by multiple parts that must themselves be scheduled for processing through the shop. The individual parts combine at assembly stations to form sub-assemblies or final assemblies. Sub-assemblies combine with other subassemblies to form final assemblies. The objective pursued in the developed model is to maximize the machine utilization subject to satisfying job due date requirements. Essentially, one must consider machine availability, the amount of work on each machine for each operation, the precedence constraints, and the dispatching criteria to perform scheduling in this kind of environment. A heuristic algorithm is developed to solve the problem. The application of the algorithm is demonstrated with an example problem.

Additional information

Notes on contributors

S. R. DOCTOR

Iroquois Tool Systems, Inc. 101 Loomis Street North East, PA 16428, USA.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.