96
Views
35
CrossRef citations to date
0
Altmetric
Original Articles

A construction algorithm for the machine layout problem with fixed pick-up and drop-off points

&
Pages 2575-2589 | Received 01 Dec 1992, Published online: 27 Apr 2007
 

Abstract

A construction algorithm which considers some practical aspects of the machine layout problem is presented. The methodology considers machine dimensions and their input and output locations with flow data. The layout is generated on a continuum, considering the best configuration and orientation of input and output locations of machines to minimize the material flow cost. The location procedure searches along the boundary of existing machines. A bi-criterion optimization approach is proposed to overcome one of the weaknesses inherited by construction procedures. The suggested construction procedure is implemented on a microcomputer and applied to solve some test problems with encouraging results.

Notes

† To whom correspondence should be addressed.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.