A decomposition scheduling method for operating flexible manufacturing systems

, &
Pages 161-178 | Received 01 Jun 1993, Published online: 07 May 2007
 

Abstract

A ‘decomposition scheduling method’ is proposed for operating a flexible manufacturing system with small buffer capacity. It is made clear that the optimum schedule obtained by using an optimum scheduling algorithm, i.e. the Johnson or Jackson rule to minimize makespan for a 2-machine FMS, requires too large an amount of buffer capacity to realize. In the decomposition scheduling method, a set of unscheduled jobs are decomposed into several sets of jobs and the optimum subschedules are derived independently for each set of jobs. A near-optimum schedule is obtained by connecting these sub-schedules arbitrarily. The schedule obtained through the decomposition scheduling method gives a high degree of approximation in the system utilization and dramatically reduces the buffer capacity.

Additional information

Notes on contributors

N. HIRABAYASHI

To whom correspondence should be addressed at Department of Industrial Engineering, College of Engineering, University of Osaka Prefecture, 1-1 Gakuen-cho, Sakai, Osaka 593, Japan.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.