139
Views
29
CrossRef citations to date
0
Altmetric
Original Articles

Sequencing jobs on an automobile assembly line: objectives and procedures

Pages 1219-1236 | Received 01 May 1993, Published online: 07 May 2007
 

Abstract

Here a paced automobile assembly line is considered with no buffers between stations. Setup costs are incurred each time sequence of jobs switches colour in the paint shop, and utility work costs are incurred when some amount of work on a job cannot be completed within the boundary of a trim station. Although there has been a concerted effort to reduce setup costs, the nature of the changeovers makes it difficult to reduce to zero. Thus, there is a need for procedures that systematically consider both setup and utility costs, not only to improve current operations, but also to evaluate the economic benefit of investments in setup cost reduction. First, an algorithm with a look-ahead provision is developed to determine sequences for trim stations only. Later, setup cost is included and solution approaches are developed based on the previous algorithm. Extensive empirical study is done by using real as well as random data to evaluate performances of procedures.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.