Integration of priority dispatching and due-date assignment in a job shop

Pages 1813-1825 | Received 10 Apr 1987, Published online: 30 May 2007
 

Abstract

A simulation study to investigate the effect on missed due-dates and job flow-time is discussed by combining the job dispatching and due-date assignment decisions in job shop scheduling. A ‘semi-local’ due-date-oriented dispatching rule is designed which is able to monitor the progress of jobs closely. The performance of the dispatching rule is enhanced by a rational due-date assignment procedure which takes account of both job content and shop status information in determining due-dates. The simulation results show that the combined scheduling procedure performs better than some common simple dispatching rules which are used with the total-work-content (TWK) due-date assignment method.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.