Abstract
The effects of inspection error on performance measures of a single-sampling plan are well documented. This paper considers the effects of inspection error on the operating characteristic curve, average outgoing quality, and average total inspection of a double sampling plan. These effects are examined for sampling both with and without replacement.
Additional information
Notes on contributors
S. Maghsoodloo
Dr. Maghsoodloo is an Associate Professor in the Department of Industrial Engineering. He is a member of ASQC.
B. K. Bush
Ms. Bush is a Graduate Student of the Department of Industrial Engineering.