The Case of Baku-Tbilisi-Ceyhan Oil Pipeline System: A Review

Pages 117-126 | Published online: 22 Sep 2006
 

Baku-Tbilisi-Ceyhan (BTC) Main Export Oil Pipeline Project (MEP) is one of the very good demonstrations of how governments could come together for the same purpose and could promote the realization of the specific project. The BTC project, being the first leg of the East-West Energy Corridor and once treated as a “dream project” by some group of experts, has now almost turned in to a physical entity. Until now, detailed project studies confirmed the project is well within its previously estimated budget of 1.427 billion USD for the Turkish section of the pipeline. The next phase will be the Land Acquisition and Construction Phase, which will take 32 months onwards. BTC-MEP has a maximum capacity of 50 million tons/year (1 million barrels/year) and a total length of 1,743 km.

Log in via your institution

Log in to Taylor & Francis Online

PDF download + Online access

  • 48 hours access to article PDF & online version
  • Article PDF can be downloaded
  • Article PDF can be printed
USD 61.00 Add to cart

* Local tax will be added as applicable

Related Research

People also read lists articles that other readers of this article have read.

Recommended articles lists articles that we recommend and is powered by our AI driven recommendation engine.

Cited by lists all citing articles based on Crossref citations.
Articles with the Crossref icon will open in a new tab.