409
Views
10
CrossRef citations to date
0
Altmetric
Original Articles

Scheduling step-deteriorating jobs on bounded parallel-batching machines to maximise the total net revenue

, , , &
Pages 1830-1847 | Received 20 Dec 2017, Accepted 10 Apr 2018, Published online: 17 May 2018
 

Abstract

This paper addresses a parallel-batching scheduling problem considering processing cost and revenue, with the objective of maximising the total net revenue. Specifically, the actual processing time of a job is assumed to be a step function of its starting time and the common due date. This problem involves assigning jobs to different machines, batching jobs, and sequencing batches on each machine. Some key structural properties are proposed for the scheduling problem, based on which an optimal scheduling scheme is developed for any given machine. Then, an effective hybrid VNS–IRG algorithm which combines Variable Neighborhood Search (VNS) and Iterated Reference Greedy algorithm (IRG) is proposed to solve this problem. Finally, the effectiveness and stability of the proposed VNS–IRG are demonstrated and compared with VNS, IRG, and Particle Swarm Optimization through computational experiments.

Log in via your institution

Log in to Taylor & Francis Online

PDF download + Online access

  • 48 hours access to article PDF & online version
  • Article PDF can be downloaded
  • Article PDF can be printed
USD 61.00 Add to cart

Issue Purchase

  • 30 days online access to complete issue
  • Article PDFs can be downloaded
  • Article PDFs can be printed
USD 277.00 Add to cart

* Local tax will be added as applicable

Related Research

People also read lists articles that other readers of this article have read.

Recommended articles lists articles that we recommend and is powered by our AI driven recommendation engine.

Cited by lists all citing articles based on Crossref citations.
Articles with the Crossref icon will open in a new tab.