Ozone Plant Operations Under Drought Conditions

, , , , , & show all
Pages 202-208 | Received 29 Jan 2017, Accepted 29 Jan 2017, Published online: 15 Mar 2017
 

ABSTRACT

The Metropolitan Water District of Southern California (Metropolitan) owns and operates five potable water treatment plants. Currently four of the treatment plants utilize ozone as the primary disinfectant. The Metropolitan ozone contactors are over-under baffled and include 10 chambers, an afterbay, and an effluent channel. Ozone is generally added in either the first countercurrent gas/liquid flow chamber (Chamber 1) or the first and second (co-current gas/liquid flow) chambers. Disinfection credit is received from ozone residuals in Chambers 2 through 6. An ozone destruct system collects and destroys ozone off-gases from Chambers 1 through 9 and an ozone quenching system is used to minimize dissolved ozone from leaving the contactors. Severe drought in California, and resulting water supply limitations, have created significant operational issues ranging from reduced plant flows to source water changes and water quality challenges. The combination of reduced flow and different source water conditions resulted in the ozone systems being operated occasionally under unfamiliar conditions. This article discusses some of the challenges faced in operating the ozone plants at low flows and low ozone production rates. Further, water quality issues required prudent management of operations to meet regulatory requirements. From the lessons learned, several recommendations are offered in preparation for similar conditions in the future.

Acknowledgments

The authors are grateful for the steadfast support provided by Kerwin Rakness in Metropolitan’s decades-long ozone-related research, design, and construction activities. Kerwin’s ability to provide us with encouragement, guidance, and technical solutions were invaluable in our $1.2 billion program. Our ozone facilities will stand as a lasting tribute to Kerwin’s impact.

Log in via your institution

Log in to Taylor & Francis Online

PDF download + Online access

  • 48 hours access to article PDF & online version
  • Article PDF can be downloaded
  • Article PDF can be printed
USD 61.00 Add to cart

Issue Purchase

  • 30 days online access to complete issue
  • Article PDFs can be downloaded
  • Article PDFs can be printed
USD 403.00 Add to cart

* Local tax will be added as applicable

Related Research

People also read lists articles that other readers of this article have read.

Recommended articles lists articles that we recommend and is powered by our AI driven recommendation engine.

Cited by lists all citing articles based on Crossref citations.
Articles with the Crossref icon will open in a new tab.