Abstract
The transportation of production and processing of petroleum fluids in pipelines and other transport lines can be significantly affected by flocculation, deposition and plugging. This problem has tremendously affected Nigerian pipelines for oil and gas transport. In this paper, the flow assurance considered includes the prevention, mitigation and remediation of hydrate. A mathematical model for predicting the equilibrium conditions for hydrate formation is: